OVERVIEW
A leading offshore exploration and production company with Deepwater and shallow water assets in the Gulf of Mexico contracted TEMS International to support workover/completion operations.
TEMS Technical Environmental Specialists oversaw all drilling operations and recorded all subsequent information.
The overall aims of the project were to:
- Achieve governmental oil on wet cuttings (OOWC) limitations in line with EPA reporting
- Optimise solids control equipment to deliver maximum solids removal with minimum liquid retention
- Reduce synthetic based mud surface consumption
- Reduce shaker screen consumption
- Minimise environmental impact
- Reduce carbon footprint
| N/A | > | Fewer barrels of mud used |
| N/A | > | Saved on mud costs |
| N/A | > | Savings on dilution |
| $634,790.00 | > | Waste fluid savings |
| N/A | > | Estimated rig days saved |
| N/A | > | Estimated rig day rate |
| N/A | > | Estimated savings on rig day rate |
| N/A | > | Estimated boat days saved |
| N/A | > | Estimated boat day rate |
| N/A | > | Estimated savings on boat rate |
| $634,790.00 | > | Total assumed savings for the well |
| N/A | > | Final well ROC including SVD % |
For more information contact